Projects

Seplat Petroleum
2020 (completed)
Supply of Qty. 6,120m, 6” API 5L, Gr X52, 3PE Coated, SMLS, Line Pipe

Seplat Petroleum
2020 (completed)
Supply of Qty. 6,084m, 6” API 5L, Gr X42, 3PE Coated, SMLS, Line Pipe

Elcrest E & P Ltd.
2019 (completed)
Construction of Mooring and Breasting facilities for crude oil storage vessel and Early Production Facility (EPF) at Gbetiokun location

Elcrest E & P Ltd.
2019 (on-going)
Construction of Mooring and Breasting facilities for crude oil storage vessel at Benin River Valve Station location

Chevron
2017 (completed)
Production, Supply and Installation of a 10-Ton EGTL – Multiple Waste Stream, Rotary Kiln Incinerator

Nigerian Gas Company
2015 (completed)
Gas Supply to NIPP Egbema: Detailed Engineering Design of 12” X 23km Pipeline from NAOC OB-OB Gas plant to NIPP Egbema

Nigerian Gas Company
2015 (completed)
Gas Supply to Ibafo, Mowe and Sagamu Interchange Customers: Detailed Engineering Design of 24” X 3 km gas Pipeline from Ibafo Valve Station to the proposed City Gate at Ibafo and 12” X 30 km Gas Pipeline from City Gate to Sagamu Interchange

Seplat Petroleum
2015 (completed)
Supply of 27,000m, 6” 168.3mm OD, 0.500” WT, 48.37kg/m, Grade X52, PSL 2, 3PE Coated, SMLS Line Pipe

Nigerian Gas Company
2015 (completed)
Replacement of 3 Nos. Control Valves on Separator and Scrubber at NGC, Sagamu Metering Station

Nigerian Gas Company
2015 (completed)
Hook-up of Geregu Metering Station to Public Power Supply (33KV Line)

Seplat Petroleum
2013 (completed)
Supply of 18,000 ft, 9-5/8”, 47Ib/ft, N80, BTC, R3, Minimum Drift 8.525”, API, Seamless Casing

Total E & P
2012 (completed)
Construction of 3 Nos., 16” diameter Water Wells (Borehole) for OML 58 Upgrade Project at Ogbugu Flow Station

Chevron
2011 (completed)
Production, Supply and Installation of a 10-Ton EGTL – Multiple Waste Stream, Fixed Hearth Incinerator